Showing posts with label Stone. Show all posts
Showing posts with label Stone. Show all posts

Thursday, August 25, 2016

How to Govern Stone Water Spots

The formation of water spots cause and its composition is very complex, different surroundings cause different formation of water spots reasons. There are some methods to help you how to govern stone water spots.

Govern Stone Water Spots

1. The physical baking method
This method is the use of high temperature heat separate out water of alkali - silica body, so that it becomes solid, then using stone conservation agent to waterproofing. Because of this method just handle surface of stone, so it will absorb moisture from bottom of stone and regenerated water spots.

2. The chemical cleaning method
This method is use stone water spots scavenger, removal or destruction of stone plaques formed in water base or alkali - silica gel (CSH), they lost the ability to absorb moisture, so can removed water spot.

3. The cleaning baking synthesis method
Use stone water spots scavenger remove or destroy silica gel (C-S-H) of water spot, and then use dried stone baking method to dry water.

4. Brightening toner method
Brightening toner method is that the lighter part stone color of water stone lesions deepened to reach the dark part of the same or close to the color of the stone, so as to achieve beautiful decorative.

Currently, it is no valid for governance of water spots , this is an urgent problem in our industry to solve. In view of this, to prevent water spots is particularly important.

How to Prevent Stone Occuring Water Spots

Wednesday, August 24, 2016

How to Prevent Stone Occuring Water Spots

Water spots lesions is harmful for stone, so we need master how to prevent water spots lesions.


The specific method is:
1. Use special protective agent to deal with stone before installation. Especially protection of the bottom surface of the stone.

2. The wet installation of stone should reduce the moisture content of the cement mortar and mortar amount. In a word, you can use semi-dry cement mortar.

3. It is better to use  bottom surface of stone slurry method. To avoid use pouring syrup on a semi-dry mortar base to affix the stone.

4. Set aside adequate water vapor channel when you install stone. After install, keep empty smooth inner stone patchwork anda week later to treated caulking .

5. Wet paste to install stone should avoid the rain or moisture (especially just after installation of two to three weeks).


How to Clean Marble Different Stains